How AXIOS Engineering and PERI UP Scaffolding Saved 21%
After Hurricane Katrina struck New Orleans, a nationally registered historic hotel remained mostly empty. It needed an expertly engineered renovation to become one of the largest hotels in a storied hospitality brand’s genre-defining portfolio.
Download the case study to see how AXIOS' engineering, in combination with the technically advanced PERI UP scaffolding system, delivered cost savings, safely.